top of page
American Antimony Corporation logo

THE AMERICAN ANTIMONY PROJECT

4000+ CONSOLIDATED ACRES

Consolidating and developing one of the most strategic antimony assets in the United States, focused on critical mineral security and district-scale exploration across Nevada's premier mining landscapes.

LAND AREA

4000+ Acres

HEAD GRADE

30.3% Sb

METALLURGY

97% Recovery

THE DISTRICT

Building A Strategic
U.S. Antimony System

The American Antimony Project represents one of the most significant emerging antimony development opportunities in the United States, combining historical production, district-scale consolidation, high-grade mineralization, modern exploration, and advanced metallurgical validation.

The Company continues advancing exploration, geological modeling, permitting initiatives, underground mapping, and bulk sampling efforts focused on strengthening domestic critical mineral supply chains.

District-Scale Consolidation

Advanced Metallurgical Validation

Domestic Strategic Relevance

UNDERGROUND
WORKINGS

The historical underground development at the Antimony King Mine provides a robust foundation for modern critical mineral security. Integrating advanced structural mapping with geological interpretation, we are defining district-scale potential through high-precision mine planning.

MODERN TECHNICAL VALIDATION

Deployment of photogrammetry integration and geological modeling tools to validate high-grade mineralization targets and optimize future accessibility strategies.

  • Underground Development
  • Structural Mapping
  • LIDAR Integration
  • District-Scale Geological Understanding
Drilling crew and rig
Drill chips trays

TECHNICAL VALIDATION

DRILLING RESULTS & VALIDATION

Successful validation of the geological model confirming district-scale antimony mineralization across the primary corridor.

285 FT

Continuous Mineralized Intercept

1.46% Sb

Average Grade

5.59% Sb

Peak Interval

14 Holes

RC Drill Holes Completed

The 2025 drilling campaign successfully validated the continuity of the antimony-bearing felsite dike system across the Bernice Canyon corridor and confirmed district-scale mineralization potential.

  • Geological Continuity
  • Multiple Successful Intercepts
  • District Expansion Potential
  • Future Targeting Opportunities
GEOLOGICAL VALIDATION

Drilling confirmed the structural interpretation and strengthened confidence in future exploration and development initiatives within the primary mineralization corridor.

VALIDATED RESULTS

METALLURGICAL &
MINERALOGICAL
VALIDATION

Independent testing and mineralogical analysis produced premium-grade antimony concentrates, confirmed stibnite as the dominant mineral, and identified exceptionally low arsenic-bearing mineral content. These results support favorable processing characteristics, concentrate quality, and strategic importance as a domestic source of antimony.

30.3% Sb

Average Head Grade

ALS Metallurgy Test Results

63% Sb

Concentrate Grade

Premium Antimony Concentrate Produced

97%

Recovery

Contained Antimony Recovery

0.2%

Arsenopyrite Content

Exceptionally Low Arsenic-Bearing Mineral Content

PROCESSING VALIDATION

Third-party flotation testing at ALS Metallurgy produced ~63% Sb concentrate at ~97% recovery from ~30.3% Sb head grade using conventional flotation, confirming best-in-class recovery metrics for refined domestic antimony supply.

MINERALOGICAL VALIDATION

Independent mineralogical and petrological studies confirmed stibnite-dominated mineralization in a felsite dike system, multiple mineralization styles, and exceptionally low arsenopyrite content, identifying district-scale hydrothermal system potential.

PETROLOGY

Multiple styles identified

MINERALOGY

Stibnite confirmed

METALLURGY

30.3% Sb average

FLOTATION

63% Sb concentrate

RECOVERY

97% Sb recovery

Antimony Trend Map
Historical Mines Map

“A District Unified Under One Company.”

Hyperspectral Map

BERNICE CANYON DISTRICT

DISTRICT SCALE OPPORTUNITY

The American Antimony Project strategically consolidates the most significant historical workings across the Bernice Canyon corridor—including Antimony King, Arrance, King Solomon, IHX, No Name, Hoyt, and Blue Eagle—into a single, unified district-scale operation. This consolidation allows for systematic exploration and long-term development of a continuous mineralized trend that was previously fragmented, unlocking unparalleled scale and production potential within Nevada's most prolific antimony system.

2.5-3+ KM

Mineralized Trend

4,000+

Acres Controlled

MULTIPLE HISTORICAL PRODUCERS

Mineralization occurs throughout the consolidated district and is rigorously supported by extensive historical mining records, high-resolution geological mapping, and modern exploration data. This convergence of data points reinforces the scale and robust nature of the hydrothermal system underlying the Bernice Canyon district.

ANTIMONY KING

LOFTHOUSE

MARGUERITE

ARRANCE

HOYT

BLUE EAGLE

KING SOLOMON

DRUMM

IHX

UBET

10+

Historical Mines & Workings

100%

District Consolidation

THE BERNICE LEGACY

An Investor Story of Strategic Consolidation

Screenshot 2025-07-11 at 3.11.42 PM.png
headline-3.png

The Bernice District carries over a century of high-grade history. Originally discovered in the late 1880s, these mines fueled early American industrial growth before being fragmented for decades. Today, for the first time, they are unified.

Screenshot 2025-07-11 at 1.53.24 PM.png
headline-2.png
THE PIONEERS

Warren Willard Williams

Warren Willard Williams — Churchill County mining pioneer and one of the most influential figures associated with the Bernice District.

headline-1.png

Bernice Quartz Mill

Historic illustration of the quartz mill that processed material from the Bernice District.

Camp.webp

Historic Bernice Mining Camp

The original Bernice settlement served as the operational center of one of Nevada's most significant antimony-producing districts.

"THE LARGEST CONSOLIDATION OF HIGH-GRADE ANTIMONY ASSETS IN THE UNITED STATES. A UNIFIED VISION FOR AMERICAN INDEPENDENCE."

THE BERNICE TIMELINE

1908

Antimony Found At Camp Of Bernice

1940

Antimony Again Is Produced At Bernice Canyon

1909

Antimony Ore Being Shipped From Bernice

1941

Antimony Buyer Visits Producers

1915

Bernice Canyon Is Again Active

2022

A forgotten District Rediscovered and Unified

1916

Old Bernice Was Antimony Center

2025

Modern Drilling Confirms District Scale Potential

"BERNICE IN EARLIER YEARS WAS ONE OF THE MOST PRODUCTIVE ANTIMONY DISTRICTS IN NEVADA." — 1915

"THE BERNICE ANTIMONY IS THE PUREST OF ANY FOUND IN NEVADA." — HISTORICAL NEVADA PRESS

"OLD BERNICE WAS ANTIMONY CENTER" — 1916

"ANTIMONY ORE BEING SHIPPED FROM BERNICE" — 1909

THE HISTORICAL ARCHIVE

Screenshot 2026-05-29 at 10.33.06 PM.png
Bernice, Nevada: Once the Largest Town in Churchill County
Screenshot 2026-05-29 at 10.38.13 PM.png
1970 Geological Memorandum Report 
Screenshot 2026-05-29 at 10.43.35 PM.png
Antimony Veins at Bernice, Nevada - 1916

Transparency and technical validation remain core principles of the American Antimony Project. Investors, analysts, and industry professionals can explore the geological, metallurgical, engineering, and permitting work that continues to advance the Bernice Canyon District toward future development.

TECHNICAL REPORTS & DEVELOPMENT CENTER

Access geological mapping, drilling results, metallurgical studies, technical reports, historical records, and development milestones related to the American Antimony Project.

[ GEOLOGICAL MAP ]

MAPPING & SAMPLING

District-scale geological mapping, surface sampling, and historical data compilation have established the foundation of the Bernice Canyon exploration model.

[ MICROSCOPE ]

PETROGRAPHY & MINERALOGY

Petrographic and mineralogical studies provide critical insight into the stibnite-bearing system and support the geological interpretation.

[ DRILL CORE ]

PHASE I DRILLING PROGRAM

The inaugural drilling campaign confirmed the continuity of mineralization throughout the Bernice corridor.

  • • 285-Foot Mineralized Intercept
  • • Multiple Stibnite Intersections
  • • District Continuity Confirmed

[ TECHNICAL REPORT ]

NI 43-101 TECHNICAL REPORT

Independent technical reporting provides a comprehensive review of the project's geology, historical mining activity, and exploration potential.

[ PROCESSING PLANT ]

METALLURGICAL TEST WORK

Independent metallurgical testing validates concentrate production potential and recovery characteristics.

  • • ~30.3% Antimony Head Grade
  • • ~63% Antimony Concentrate
  • • ~97% Recovery

[ 3D MODEL ]

3D MODELING & SMALL MINE PERMIT

Geological datasets are being integrated into a district model while evaluating permitting pathways.

Status: IN PROGRESS

FROM HISTORICAL PRODUCTION TO MODERN VALIDATION — THE AMERICAN ANTIMONY PROJECT IS BEING ADVANCED THROUGH A SYSTEMATIC DEVELOPMENT PROGRAM BUILT UPON MORE THAN A CENTURY OF DOCUMENTED MINING HISTORY.

HISTORY • GEOLOGY • METALLURGY • DRILLING • MODELING • DEVELOPMENT

bottom of page