top of page
American_Antimony_BOLDTM_2x.png

News & Disclosures

American Antimony Project

Who We Are

Our story

The American Antimony Project is located in Bernice Canyon within the Bernice Mining District of Churchill County, Nevada, approximately 70 km (42 miles) northeast of Fallon. The project is the Company’s flagship asset and is 100% owned by American Antimony Corporation.

The project currently comprises approximately 201 lode mining claims covering 4,153 acres, encompassing the historically documented Antimony King Mine and the majority of known antimony occurrences within the Bernice Mining District. The land position covers several historic mine workings and mineralized zones associated with past antimony production.

The primary mineral targeted by the Company is antimony, a critical industrial semi-metal used in lead-acid batteries, semiconductors, flame retardants, alloys, and numerous defense and military technologies. Within the Company’s claim boundaries, eight historically documented antimony mines have been identified, highlighting the district’s long history of antimony production.

Recent exploration programs have significantly advanced the technical understanding of the district. The Company’s Phase 1 drilling campaign confirmed world-class antimony intercepts, including 87 meters (285 feet) grading 1.46% Sb, including intervals up to 5.59% Sb and 1.33 g/t Au, representing one of the largest and most significant antimony intercepts reported in modern documented drilling history.

AMSB MAP.jpeg

The drilling program confirmed a felsite dike–hosted stibnite mineralization system extending over approximately 3.2 kilometers, demonstrating strong structural continuity and district-scale potential across the Bernice Canyon project area.


Subsequent metallurgical programs have further validated the strength of the system. Bulk samples sourced from the Antimony King system have returned average head grades of approximately 30.3% Sb, producing antimony concentrates grading approximately 63% Sb with recovery rates approaching 97%, demonstrating exceptional upgrade capability and strong flotation response.

The Company is advancing the project through a disciplined staged development strategy, including ongoing metallurgical testing, permitting, and controlled access to mineralized zones and historic stockpiles. American Antimony has also initiated the Small Mine Permit process for the Antimony King Mine as part of its strategy to responsibly advance the project toward early-stage mining operations.

Through continued technical validation, permitting progress, and strategic partnerships, the Company believes the American Antimony Project is well positioned to support the development of high-grade antimony concentrate production within the United States, contributing to the growing need for secure domestic supply of this critical mineral.

Element Didn’t Load
Due to a technical issue, we were unable to load this element.
Check your internet and refresh this page.
bottom of page